What Will Happen in Phase I?

  • Park construction on 10 acres of land overlooking the water of the Iron River Flowage
  • Clearing land of debris, shrubs & trees to burn brush piles & remove the last of the tree roots
  • IR Fire Department to conduct burn of downed trees & debris
  • Electricity and water brought to the site
  • Set grade for walking paths, parking lot, driveway & Memorial site
  • Surface these areas for use; handicapped accessible
  • Designate picnic area and eventually a full playground
  • Construct Memorial & site area (this is a special project within Phase I; details will be highlighted as it develops)
  • Maintenance building erected for utilities, well enclosure & small equipment storage.

What Phase I Projects Have been Completed?

  • Secured property from Bayfield County & completed soil testing as well as various re-zoning requirements
  • Official Groundbreaking Celebration was 5-18-18
  • Completed land surveying & design plan
  • Majority of timber cleared & some root removal
  • Erected timber poles for oversized Park sign (visible from Hwy #2)
  • Worked (and continue to work) with various possibilities for volunteers and in-kind or cash donations

Primary Sidebar

Project Plans

  • About
  • Phase One
  • Phase Two
Donate Now and Get a Commemorative George Skypeck Poster

Join Us

  • Become a member
  • Donate Now
We'd love to discuss our project with you, contact us at: info@acrossthepondveteranspark.org

Contact Us

PO Box 31 Iron River, WI 54847 acrossthepondpark@gmail.com

Copyright © 2021 · Accross The Pond Park · Log in

  • About
  • Phase One
  • Phase Two